Sunday, January 08, 2012

Sleeping Loft Update

Before sunrise Saturday while my bride was in New Albany getting a new knee, I went and grabbed Robbie to help me get the 120+ lb cast iron art work up on the loft and in position. For a couple of over weight fat guys, it was just about all we could handle and were lucky we didn't drop it through the frame on the floor. Almost done with this part of the project. Just need to polyseal the wood work.

View from living room area

The cast iron artwork is 29"x68" and weighs 121lb

Sleeping loft view from access ladder. Ready for a bed.

View from kitchen table. Almost ready for tongue and
groove flooring.

View from entry door.